2334 Stonebridge Circle, Unit D
West Bend, WI 53095
800-766-9918
8a •MBE • WBE • DBE • SBC • EBE
Home About Us Projects Safety News Careers Links Contact Us
VA Radiology
VA Medical Center
USDA Lab Hood Exhaust
Ft McCoy Headworks Bldg
Great Lakes Navy HVAC Renovations Bldg 523
Amtrak
Mauthe Lake
Waukesha Fire Station
Harley Davidson
Potawatomi Casino
Federal Courthouse
Parklawn Assembly of God

Harley Davidson Museum, Retail Building, and Annex

One of the largest construction jobs in the state of Wisconsin, Belonger is currently actively working on this project as a subcontractor providing complete plumbing on three buildings. Work consists of providing and installing New Site Sanitary, Storm and Water, Interior Sanitary, Storm, Water, New Fixtures, Water Heaters, Pumps, and Reverse Osmosis System for the Museum (24,188 GSF), Retail (12,579 GSF) and Annex (24,188 GSF) Buildings. Three buildings consisting of a complete museum with dust-free exhibits, restaurant servery and bar, a complete retail building, and a skywalk connecting the three buildings. Belonger has
also been involved in some designing through Change orders.

Project is currently on schedule.

Projected completion May 2008

 
Licensed • Bonded • Insured • Unionized • Certified • Safety Program
Confined Space Entry Program • EPA Reclamation Program
Quality Control Program • “TQM” Total Quality Management
Army Corps of Engineers Quality in Construction Management