Building addition and equipment upgrade for the Headworks Building at the Waste Water Treatment Plant at Fort McCoy. The project consisted of the installation of a JWC Muffin Monster Fine Screen System and Muffin Monster Mini-Washer, (1) 7.5-Ton Make-Up Air unit, (1) 300 CFM exhaust fan, relocation of (4) existing exhaust fans, addition of 2,000 square feet of new building space, relocation of existing yard hydrant, demolition of existing hose bib, new electrical and fire alarm, relocation of all existing equipment controls, epoxy paint floor and walls, removal of existing trees, new and relocate sidewalk, and seeding of disturbed grass areas.
Construction Completed: 2007
|